Launched?
Pilot only. Stage: pilot / testing.
Pilot only. Stage: pilot / testing.
Q4 2026. National wallet solution (end-2026 target).
50 days to the EU deadlineSupplier unconfirmed.
Smart-ID, Mobile-ID, ID card and LT ID for login and signing via the eGovernment Gateway and banks.
| Law in force | No date set | 2018 eID law exists; EUDI provider/supervisor appointments only proposed in VSSA/EY study; draft law not published source ↗ |
|---|---|---|
| Builder named | No date set | Procivis selected 2026-02-05 for a 12-month sandbox only; VSSA proposed as provider, not appointed source ↗ |
| Pilot/prototype evidenced | Confirmed 10 Apr 2026 | APTITUDE partners tested the national sandbox app with PID and attribute issuance source ↗ |
| Beta testing (access varies) | Not confirmed | No note recorded source |
| Generally available | Target Q4 2026 | Ministry minutes target end-2026; Interior earlier said 2026-2027 source ↗ |
| EUDI certified | Not confirmed | No scheme, assessor or certificate confirmed source |
Current national delivery. Evidenced events may include historical prototypes; beta testing access varies. National availability does not establish EUDI certification.
C 52.7 of 100 · 15th of 27
2 of 27 countries are at a later stage; 9 at the same stage.
● Evidenced input · Hatched: limited evidence
MyID EU Wallet Scorecard methodology v1.0, 4 Nov 2026. Grades describe published evidence, not legal compliance. Full scorecard.
10.0, limited-evidence; EU median 15.0; 1 of 6 inputs evidenced.
0.0, limited-evidence; EU median 10.0; 0 of 5 inputs evidenced.
98.0, A; EU median 87.4; 1 of 1 inputs evidenced.
89.2, A; EU median 69.5; 2 of 2 inputs evidenced.
66.4, B; EU median 66.4; 1 of 1 inputs evidenced.
| Country | Score | Grade | Rank |
|---|---|---|---|
| Italy | 77.6 | B | 1 |
| Finland | 70.3 | B | 2 |
| Denmark | 62.7 | C | 3 |
| Estonia | 58.7 | C | 4 |
| Hungary | 57.6 | C | 5 |
| Luxembourg | 57.0 | C | 6 |
| Slovakia | 53.9 | C | 10 |
| Sweden | 53.9 | C | 10 |
| Latvia | 53.4 | C | 13 |
| Slovenia | 56.0 | C | 7 |
| Austria | 54.5 | C | 8 |
| Netherlands | 54.4 | C | 9 |
| Poland | 53.2 | C | 14 |
| Lithuania | 52.7 | C | 15 |
| Croatia | 51.7 | C | 16 |
| Belgium | 48.6 | D | 19 |
| Malta | 53.5 | C | 12 |
| Portugal | 47.5 | D | 22 |
| France | 49.6 | D | 17 |
| Spain | 49.4 | D | 18 |
| Germany | 48.0 | D | 20 |
| Czechia | 47.7 | D | 21 |
| Greece | 36.7 | D | 26 |
| Bulgaria | 43.9 | D | 23 |
| Ireland | 42.4 | D | 24 |
| Cyprus | 38.0 | D | 25 |
| Romania | 30.0 | E | 27 |
EU pilot consortia: POTENTIALDC4EUAPTITUDE
EUDIW LT (study name; final brand not confirmed)
dedicated-app
EUDIW LT sandbox built by Procivis and tested by APTITUDE partners (Apr 2026); study proposes VSSA as provider; no law or award; end-2026 ambition.
Prototype shown Sept 2025; Procivis sandbox selected Feb 2026; APTITUDE partners installed the app and saw PID issuance 10 Apr 2026; hotel pilots next; no law, certificate or public access.
End-2026 ambition in ministry minutes; Interior earlier said 2026-2027; no exact date against 24 Dec 2026.
ID card (ATK), Mobile-ID, Smart-ID, LT ID, Paysera MobileApp
generally available
Smart-ID 1.36m Lithuanian users; ATK notified 'high' in 2020. Existing eID, not the EUDI wallet.
Hotel check-in pilot gives Irish hospitality a minimal-data use case to study; sandbox credentials are not production-valid.
It's at the pilot / testing stage. Latest confirmed step: Pilot evidenced, 10 Apr 2026.
Next step: national wallet solution (end-2026 target). That's around the EU's 24 Dec 2026 deadline.
State Digital Solutions Agency (VSSA) coordinates sandbox and APTITUDE delivers it. The builder isn't publicly confirmed.
Smart-ID, Mobile-ID, ID card and LT ID for login and signing via the eGovernment Gateway and banks. No public EUDI wallet.
POTENTIAL: Large-scale pilot: eGov, banking, telco, mobile driving licence, e-signature, e-prescription.
DC4EU: Education and social-security credentials.
APTITUDE: Second-wave pilot (2025–) continuing cross-border wallet testing.
None publicly listed as of 2026-10-15.
None publicly listed as of 2026-10-15.
Not open yet. No confirmed registration route
None publicly listed as of 2026-10-15.